The construction of a new house is an opportunity to satisfy your requirements for the design and usability of their housing. But the construction of the house may be a difficult problem, especially when it comes to money. This in -depth view of the prices associated with home construction will help you make the right budget decisions.
Homeowners report that the average cost of building a new house is 1.5 million rubles – the price that will give an acceptable house with an area of 100 square meters.m. This price, obviously, will be very different depending on the region and on all expensive variables, so the cost can be from 100.000 (log house without decoration and filling) to a couple of tens of millions of rubles (for a house from good materials with decoration, insulation, design, etc.D.).
In total, it is worth calculating the house on these points (and choose your price capabilities in each paragraph in the indicated order):
one. Calculation and selection of the cost of the building depending on the type of building (the log house can be ordered cheap, medium -sized houses from foam blocks for about 1.5 million.; A small house from SIP panels for about 500 thousand, etc.D.)
2. User houses are most expensive and the prices for them are not fixed; And the prices for finished projects (typical houses) can be found immediately on any website of the construction company (look for a company by type of building selected in paragraph 1).
3. Modular and prefabricated houses are as cheap as possible and are built as quickly as possible, which saves on many other points listed below. A modular house can be bought for 60 thousand rubles (country house) and 600 thousand rubles (beautiful mini-house). Prefabricated houses are a classic cheap version of the house, for example, log house.
four. Developers (you will pay for their work by watch or for the project; this is the work of an architect, engineer, manager and other people “gathering” a house on paper, in the electronic version, in the store, t.e. purchases, project and its maintenance)
5. The cost of materials and machines (not always in the cost of the project of the finished house includes the materials that you need, so the price of the house often changes; in addition, the price will vary depending on the prices for the delivery of the house or material to the place of construction).
6. Labor costs. The project from the picture often does not include details that will need to be built separately (and, consequently, and pay separately):
The foundation (modular houses may not be required)
Framing (beautiful and sometimes functional finish)
The main systems (electrician, water supply, sewage)
The interior decoration (some turnkey houses are done with a rough finish, others with a finish ready for decoration, but almost no house is done in ready -made interiors)
7. Additional factors affecting the cost of the house, for example, installation of windows other than the project or unexpected problems with the soil on the site, requiring complicating the design of the foundation.
The main steps of building a house:
one. Budget check
2. Buying land
3. The choice of construction method
four. Planning Design
5. Permits and verification
6. Insurance
7. Start of construction
eight. Final check
9. Decor
ten. Landscape design